Improving Quality of Construction Projects in Governmental Contracting Companies – Views of Project Managers at Ministry of Construction and Housing

Main Article Content

Zeyad S. M. Khalid

Abstract

Quality assurance as a cultural standing point and economic role become more essential in the view of the new activation of the Iraqi Construction Sector. A comprehensive view of local factors must be considered side by side with the international development issues. This paper discusses the results of obtaining construction managers consensus opinion on factors to improve quality in the construction projects of governmental contracting companies. With the aid of Nominal Group Technique a consensus opinion of 100 construction managers in the Ministry of Construction and Housing is obtained on 25 factors sudjested by them to improve quality on their projects together with the relative importance of each factor. A Pareto analysis is carried out to show the weight of contribution of each factor and it was found that basic wages and quality related incentives together with obligations and delegations to construction project managers are the most important factors. The factors that have the same source of problems were also combined and categorized into five areas where it was found that satisfaction and quality knowledge together with instructions and procedures are the most critical areas. These findings are compatible with the new philosophy of total quality management.

Metrics

Metrics Loading ...

Article Details

Section
Articles

Plaudit

References

Griffith, A. (1990). “Quality assurance in building.” Macmil- lan Education Ltd., Basingstoke, U.K. DOI: https://doi.org/10.1007/978-1-349-20853-1

Hughes, T., and Williams, T., (1991). “Quality assurance , a framework to build on.” BSP Professional Books, Oxford, U.K.

“Quality systems.” (1987) BS 5750, part 1, British Standards Institution, London, U.K.

Johnson, P. L. (1993). “ISO 9000, meeting the new international standards.” McGraw-Hill Book Co. Inc., NewYork.

Flood, R. L. (1993). “Beyond TQM.” John Wiley & Sons Ltd., Chichester, U.K.

“ISO 9001: Quality Systems – Model for Quality Assurance in Design, Development, Production, Installation, & Servicing.” (1994). International Organization for Standardization, Geneva, Switzerland.

Abdel-Razek, R. H. (1997). “How construction managers would like their performance to be evaluated.” J. Constr. Engrg. and Mgmt., ASCE, 123(3), 280 – 286. DOI: https://doi.org/10.1061/(ASCE)0733-9364(1997)123:3(208)

Stevens, J. D., Glagola, C. R., and Lebdetter, W. B. (1994). “Quality measurement matrix.” J. Mgmt. in Engrg., ASCE, .30-35 ,)6(10 DOI: https://doi.org/10.1061/(ASCE)9742-597X(1994)10:6(30)

Stevens, J. D. (1996). “Blueprint for measuring project quality.” J. Mgmt in Engrg., ASCE, 12(2), 34-39. DOI: https://doi.org/10.1061/(ASCE)0742-597X(1996)12:2(34)

Harris, F., and McCaffer, R. (1993). “Modern construction management.” BSP Professional Books, Oxford, U.K.

Culp, G., Smith, A., and Abbott, J. (1993). “Implementing TQM in a consulting engineering firm.” J. Mgmt.in Engrg., .340-355 ,)4(9 DOI: https://doi.org/10.1061/(ASCE)9742-597X(1993)9:4(340)

Ledbetter, W. B. (1994). “Quality performance on successful projects.” J. Constr. Engrg. and mgmt., ASCE, 120(1), 34-46. DOI: https://doi.org/10.1061/(ASCE)0733-9364(1994)120:1(34)

Graves, R. (1993). “Total quality: Does it work in engineering organizations?” J. Mgmt. in Engrg., 9(4), 444-455. DOI: https://doi.org/10.1061/(ASCE)9742-597X(1993)9:4(444)

Burati, J., and Oswald, T. (1993). “Implementing TQM in engineering and construction.” J. Mgmt.in Engrg., 9(4), 456–470 DOI: https://doi.org/10.1061/(ASCE)9742-597X(1993)9:4(456)

د.موفق جاسم الحربي (2000), “نحو سياسة وطنية للجودة في مجال التشييد”, ندوة ادارة مشاريع التشييد / الواقع وأفاق المستقبل, المجمع العلمي, العراق.

د.زياد محمد خالد (2000), “الستراتيجية التقليدية لادارة مشاريع التشييد ومتطلبات التطوير”, ندوة ادارة مشاريع التشييد / الواقع وأفاق المستقبل, المجمع العلمي, العراق.

Strange, P., & Vaughn, G. (1993). “TQM: A view from the playing field.” J. Mgmt. in Engrg., 9 (4), 390-398. DOI: https://doi.org/10.1061/(ASCE)9742-597X(1993)9:4(390)

Sanders, S., and Eskridge, W. F. (1993). “Managing the implementation of change.” J. Mgmt. in Engrg., 9 (4), 365- .379 DOI: https://doi.org/10.1061/(ASCE)9742-597X(1993)9:4(365)

Hensey, M. (1993). “Essential tools of total quality management.” J. Mgmt. In Engrg., 9 (4), 329-339. DOI: https://doi.org/10.1061/(ASCE)9742-597X(1993)9:4(329)

Similar Articles

You may also start an advanced similarity search for this article.