Cost and Time Risk Management in Construction Projects

Main Article Content

Yousif Salam Saeed

Abstract

Identifying and evaluating the business risk (Cost and time overruns) management in construction projects to control and minimize such risk is the aim of this research. In diverse construction site, qualified professional workings are asked through an online questionnaire to collect tremendous diverse thoughts to compare between them. The questionnaire developed the research and collected more sensitive/accurate and reliable data about construction business risk management. The first step in this research is to attain worthy information about business risk management in term of cost and time overruns from previous related studies. A theoretical background about management of business risk is provided by the review of these studies that led to the design of the questionnaire questions. This paper concluded that poor business performance, such as time delays and cost overruns, are common in construction projects. Poor business performances can be significantly reduced by providing adequate construction planning at the beginning of the project, accurate in estimation, preventing changes in projects during construction, improving contract management and improving communication between construction parties.

Metrics

Metrics Loading ...

Article Details

Section
Articles

Plaudit

References

Lo TY, Fung IWH, Tung KCF. Construction delays in Hong Kong civil engineering projects. Journal of Construction Engineering and Management 2006; 132 (6): 636-649. DOI: https://doi.org/10.1061/(ASCE)0733-9364(2006)132:6(636)

Meng X. The effect of relationship management on project performance in construction. International Journal of Project Management 2012; 30 (2):188-198. DOI: https://doi.org/10.1016/j.ijproman.2011.04.002

Smith N, Merna T, Jobling P. Managing risk in construction projects. 3rd ed. USA: Oxford: John Wiley & Son; 2014.

Mansfield NR, Ugwu OO, Doran T. Causes of delay and cost overruns in Nigerian construction projects. International Journal of Project Management 1994; 12 (4): 254-260. DOI: https://doi.org/10.1016/0263-7863(94)90050-7

Kaming PF, Olomolaiye PO, Holt GD, Harris FC. Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics 1997; 15 (1): 83-94. DOI: https://doi.org/10.1080/014461997373132

Frimpong Y, Oluwoye J, Crawford L. Causes of delay and cost overruns in construction of groundwater projects in development countries: Ghana as a case study. International Journal of Project Management 2003; 21 (5): 321-326. DOI: https://doi.org/10.1016/S0263-7863(02)00055-8

Chang A. Reasons for cost and schedule increase for engineering design projects. Journal of Management in Engineering 2002; 18 (1): 29–36. DOI: https://doi.org/10.1061/(ASCE)0742-597X(2002)18:1(29)

Chartered Institute of Building (CIOB). Managing the risk of delayed completion in the 21st Century.

: http://www.ciob.org/sites/default/files/CIOB%20research%20-%20Managing%20the%20Risk%20of%20Delayed%20Completion%20in%20the%2021st%20century.pdf.

Hoffman G, Thal A, Webb T, Weir J. Estimating performance time for construction projects. Journal of Management in Engineering 2007; 23 (4): 193–199. DOI: https://doi.org/10.1061/(ASCE)0742-597X(2007)23:4(193)

Ming S, et al. Industrial Report: managing changes in construction projects. Bristol UWE: School of the Built and Natural Environment; 2004: http://www.bne.uwe.ac.uk/cprc/publications/mcd.pdf.

Motawa I, Anumba C, Lee S, Peña-Mora F. An integrated system for change management in construction. Automation in Construction 2007; 16 (3): 368–377. DOI: https://doi.org/10.1016/j.autcon.2006.07.005

Park M. Dynamic change management for fast-tracking construction projects. Building and Fire Research Laboratory: Fire on the Web; 2002. http://fire.nist.gov/bfrlpubs/build02/art129.html

Yousif SS. Safety management in construction projects. UOD Journal 2017; 20 (1): 546-560. DOI: https://doi.org/10.26682/sjuod.2017.20.1.48

Hwang BG, Low LK. Construction project change management in Singapore: Status, importance and impact. International Journal of Project Management 2012; 30 (7): 817-826. DOI: https://doi.org/10.1016/j.ijproman.2011.11.001

Arain FM, Low SP. The potential effects of variation orders on institutional building projects. Facilities 2005; 23 (11/12): 496–510. DOI: https://doi.org/10.1108/02632770510618462

Isaac S, Navon R. Feasibility study of an automated tool for identifying the implications of changes in construction projects. Journal of Construction Engineering and Management 2008; 134 (2):139–145. DOI: https://doi.org/10.1061/(ASCE)0733-9364(2008)134:2(139)

Smith N, Merna T, Jobling P. Managing risk in construction projects. 2nd ed. Oxford, USA: John Wiley & Sons; 2006.

Merna A. Management and corporate risk. London: Thomas Telford: In Smith, N. J. (Ed.) Appraisal, Risk and Uncertainty; 2003.

Griffith A, Howarth T. Construction health and safety management. Edinburgh: Pearson Education; 2001.

Cretu O. Stewart R, Berends T. Risk management for design and construction. Hoboken, NJ: John Wiley & Sons; 2011. DOI: https://doi.org/10.1002/9781118984017

Olawale Y, Ming S. Construction project control in the UK: Current practice, existing problems and recommendations for future improvement. International Journal of Project Management 2014; 33 (3): 623-637. DOI: https://doi.org/10.1016/j.ijproman.2014.10.003

Similar Articles

You may also start an advanced similarity search for this article.