[1]
“Modified Method for Estimation of Total Risk Factor (TRF) for Selected Dams in Iraq”, Tikrit j. eng. sci., vol. 32, no. 2, pp. 1–13, May 2025, doi: 10.25130/tjes.32.2.32.