[1]
2025. Modified Method for Estimation of Total Risk Factor (TRF) for Selected Dams in Iraq. Tikrit Journal of Engineering Sciences. 32, 2 (May 2025), 1–13. DOI:https://doi.org/10.25130/tjes.32.2.32.